Introduction, process and characteristics of exhibition display design

  brief
  Exhibition display design can be divided into three main blocks:
  I. Temporary display
  Temporary display which includes booth design, stage design, activity planning, through the professional design company designers, to assist Party A to achieve the nature of publicity and display of enterprises and display of goods, and then in writing to provide design solutions.
  II. Long-term display
  Long-term display which includes various types of exhibition hall design, museum design, cultural museum design, urban planning museum design, etc., also through the professional design company's designers in the project to fully communicate with the project itself has a full understanding of the different projects for different positioning, and then issued a complete set of plans.
  III. Multimedia exhibition display
  Multimedia exhibition display, is in the Shanghai World Expo after the emergence of new display techniques, through the traditional decorative design as a carrier, coupled with multimedia technology to make the design of the exhibition hall "live" up to achieve human-computer interaction, interesting. Suitable for all kinds of exhibition halls, museums, planning museums and other interesting exhibition halls.
  workflows
  I. Project Contact: Get the information of the exhibitors, obtain the relevant information of the exhibitors, and clarify the delivery date of the design drawings.
  Second, design: communicate with the designer and instantly with the customer design exchanges, delivery of the first draft of the design to the customer, design instructions, engineering quotes, research customer feedback and modify again, delivery of the final draft and engineering quotes.
  Third, the contract: with the customer to determine the price of the project, clear with the customer's mutual cooperation requirements, sign the contract.
  Fourth, production: complete the production and preparation work, complete the host, the main site, the pavilion and other procedures.
  On-site construction: on-site exhibition construction, dealing with on-site additions and changes to the project, cooperating with the customer exhibits into the field, customer acceptance.
  VI. Services during the exhibition period: on-site maintenance during the exhibition period. Arranging on-site emergency services and value-added services during the exhibition, cooperating with customers' exhibits to leave the site and dismantling the site.
  VII. Follow-up.
  specificities
  First, the design of the booth should reflect the spirit of the company, company culture and characteristics of the designed enterprise.
  Second, the decorative modeling can be changed at will, and the material recyclability is high.
  Third, the overall cost is much lower compared to long-term display projects.
  Fourth, the work cycle time is short, first in the factory production processing, and then to the site to be assembled, assembly time is basically controlled within 1-3 days.